Fuzor Support Forum
  [Recent Topics] Recent Topics   [Hottest Topics] Hottest Topics   [Groups] Back to home page 
[Register] Register / 
[Login] Login 
Fuzor 1.5: How to sync back changes to Revit.  XML
Forum Index » Fuzor: How to
Author Message
Vanessa

Kalloc Studios

Joined: 19/08/2014 00:25:41
Messages: 124
Offline



Users have been waiting for this Sync Back feature for a long time. Sync Back feature is now available on Fuzor 1.5.

Sync back family placement

User makes changes on Fuzor, and in Revit ribbon can press "Request Sync Back" button to bring back changes to Revit.





Revit will now open the files with changes.



The sync back dialog box opens up, and user can choose what changes to sync back. Notice that changes are categorized and there is a short description of the changes made. User can click "Select All" button then click "Sync Selected" button to bring back all changes to revit.

Dialog Box has three statuses: green means that sync back was successful, yellow means that sync back was attempted but not successful, and red means that file could not be found. If the sync back has a status of yellow or red there is a short description of why sync back was unsuccessful.

In the image above user has synced back particle placements, cctv placements as well as family placement.

User can view successful changes that were synced back by clicking "view" button on sync back dialog box.



If user attempts to sync back family placement that could not be synced back object will have annotation assigned to it.



User can turn off annotations and manually move the object to resolve issue.




Sync back lighting adjustments

User can click light, press "Adjust lighting" button, then change lighting adjustments



When sync back is completed



The lighting adjustments made on Fuzor



are reflected on Revit




Syncing back piping refit

User can select multiple pipes by pressing down ctrl and clicking pipes, now multiple pipes can be refitted at the same time.



Once refit is complete



user can "Request sync back" in Revit once sync back is complete



In Fuzor the pipes will be rejoined correctly




Sync back trees

Syncing back trees works the same way as adding family objects.

Simply add foliage


Sync Back in Revit


and trees can be seen on Revit on the same place as in Fuzor.


This message was edited 6 times. Last update was at 17/12/2014 23:24:26

 
Forum Index » Fuzor: How to
Go to: